Elecraft K2VCOSHLDKT Manual de usuario Pagina 4

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 4
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 3
Page 4
Place the ferrite sleeve over T5, aligning both the ferrite sleeve and paper washer with T5’s component outline.
Place the 5/8” (16 mm) diameter nylon washer on top of the ferrite sleeve (Figure 6). Secure using a nylon 4-40 nut.
Figure 6
Re-install the K2’s bottom cover.
Re-install the K2’s top cover. Reconnect all cables carefully to avoid misalignment of connector pins.
Make the following notation in your K2 manual near Table 6-1: “L30 Removed. Set VCO by changing T5 turn spacing.”
Vista de pagina 3
1 2 3 4

Comentarios a estos manuales

Sin comentarios