ELECRAFT KBPF3 Especificaciones Pagina 9

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 11
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 8
9
Install two standoffs on the RF board as shown Figure 4. Be sure you place a split lock washer under the
head of the screw and between the standoff and the board as shown.
TOP OF RF BOARD
4-40 1/2" (13 mm) STANDOFF
4-40 SPLIT LOCK WASHER
4-40 SPLIT LOCK WASHER
4-40 1/4" (6.4mm) ZINC PAN HEAD SCREW
ESD SENSITIVE!
WEAR A GROUNDED
WRIST STRAP OR TOUCH
AN UNPAINTED METAL GROUND
BEFORE HANDLING THE RF BOARD.
Figure 4. Installing KBFP3 Standoffs.
Replace both bottom covers using the 4-40 black pan head screws you removed earlier. Note that three
locations take the 4-40 1/4” (6.4 mm) black pan head screws with lock washers as shown in Figure 3 while the
remainder are 4-40 3/16” (4.8 mm) screws . Be sure these are in the correct locations!
CAUTION!
Failure to replace the three 1/4” (6.4 mm) bottom screws with their lock washers in
the locations shown in Figure 3 may destroy power transistors in your K3!
Vista de pagina 8
1 2 3 4 5 6 7 8 9 10 11

Comentarios a estos manuales

Sin comentarios